The eco-parkConceptual model · simulated · draft, not an offerBuilding the plant…
The eco-park The first 150 t/day line is the demonstration plant · no plant is built today Conceptual model · not an operating plant SIMULATED · digital twin DRAFT · not an offer ENES
tFirst line Design basis150 t/day
₿The town pays ProposedNothing
⚡Power sold DesignNone
◎OCTO SI Simulation onlyNot certified
Drag to orbit · right-drag or two fingers to pan · scroll or pinch to zoom
Where it standsEach line says how far it has really got